Shaft Blasting Cadia NSW

20090126 256The development of a 6 meter diameter shaft meters away from the gold concentrate pipeline of the New Crests Cadia gold Mine was so important to Newcrest that it resulted in the direct involvement of the CEO Ian Smith. Electronic detonators, a sound design combined with a high level of vibration monitoring and management and permanent presence on site was required to protect the heart of the company.