Gåshaga Demolition


Bild231A Six storey industrial building  in the outskirts of Stockholm with quite a complex structure of steel and concrete posted a slightly larger challenge than the taller neighbouring chimney. A total charge of 100 kgs of NG based packaged charge in 200 blast holes is all it took to topple both structures over with ease.Bild24